PAST MEGADOME PROJECTS

BACK TO PROJECT MANAGEMENT
Receive a free Design Guide

Recover in Lynden, On

Originally installed in 2007, this 70×140 horse riding arena recently had a roof recover completed in a short span of 3 days by the Build Ontario team.

Recover in Lynden, On

Originally installed in 2007, this 70×140 horse riding arena recently had a roof recover completed in a short span of 3 days by the Build Ontario team.

Woodland Farms, Tillsonburg, On

This 50×132 MegaDome structure, featuring galvanized trusses spaced 12’ on centre, and steel side walls with side load overhead doors, was installed in a short span of 2 weeks.  Rather than mounting this structure on wood piers, this MegaDome was erected on a concrete grade beam to provide a continuous, secure, and everlasting foundation.  Built for the purpose of welding & agricultural building, this bright fabric structure is now a perfect weatherproof work area, and exactly what the customer had envisioned.

SITE PLAN

Woodland Farms, Tillsonburg, On

This 50×132 MegaDome structure, featuring galvanized trusses spaced 12’ on centre, and steel side walls with side load overhead doors, was installed in a short span of 2 weeks.  Rather than mounting this structure on wood piers, this MegaDome was erected on a concrete grade beam to provide a continuous, secure, and everlasting foundation.  Built for the purpose of welding & agricultural building, this bright fabric structure is now a perfect weatherproof work area, and exactly what the customer had envisioned.

SITE PLAN

GET A QUOTE FOR YOUR PROJECT

Contact Us

GET A QUOTE FOR YOUR PROJECT

Contact Us